Building Estimation Jobs

32 were found based on your criteria

  • Fixed-Price – Est. Budget: $600.00 Posted
    We have an existing property with the client to move out, this will be unoccupied during the renovations. We have architects fully documented and scoped drawings. Looking to get a quotation from Construction Cost Consultants or Quantity Surveyors to give us a full break down of the projects forecasted costs, including preliminary costs, provisional sum items on high risk or items unsure of, supervisors / foreman salary included.
  • Fixed-Price – Est. Budget: $120.00 Posted
    We require a quantity takeoff of a small office refurbishment job into a program called Buildsoft. We will provide a plan, scope of works and photos to assist with the measure. We will also provide the buildsoft template this will contain our standard measure template with most items. Some additional items will need to be added Some items in the scope will not be able to be measured. If this is the case make a note in the scope and ...
  • Fixed-Price – Est. Budget: $40.00 Posted
    Looking for quantity takeoff for public works engineering project for the project below (273 sheets). Please do a full take-off, as a general contractor would need. Download project here: https://drive.google.com/folderview?id=0B2NRbUBY3Ob8NDJlN0ZXSFBSSVU&usp=sharing ***Please reply with fixed fee bid and completion date. I'm available between 9am-5pm PST Monday-Friday once project is started. While working on the project, it would be preferred if you're also available at least partially during those times in case ...
  • Fixed-Price – Est. Budget: $40.00 Posted
    Looking for quantity takeoff for public works engineering project for the project below (36 sheets). Please do a full take-off, as a general contractor would need. Download project here: https://drive.google.com/folderview?id=0B2NRbUBY3Ob8al90NXFORzdVSmM&usp=sharing ***Please reply with fixed fee bid and completion date. I'm available between 9am-5pm PST Monday-Friday once project is started. While working on the project, it would be preferred if you're also available at least partially during those times in case ...
  • Fixed-Price – Est. Budget: $5.00 Posted
    Provide quantity takeoffs and a material STOCKING PLAN for the following list of materials to be used in an 85 unit apartment building to be built also known as "The McIntyre" Familiarize yourself with all plans and details so as to provide an accurate take off for: -NON STRUCTURAL light gauge metal track and stud to include interior unit walls, soffit, frame down, celings etc -Insulation -Interior Drywall (give alternate quantities for ALT SB wall type shown on A602) -Drywall ...
  • Fixed-Price – Est. Budget: $100.00 Posted
    Looking for quantity takeoff for public works engineering project for the project below (35 sheets). Please do a full take-off, as a general contractor would need. Download project here: https://drive.google.com/folderview?id=0B2NRbUBY3Ob8TGtqcUZnYTJNWUU&usp=sharing Must be complete by Sunday night, USA pacific time. 1. Please reply with your fixed-fee bid. 2. Which take off program are you using? 3. Also include a sample of your deliverables (what would your end product take off look like? Show ...
  • Fixed-Price – Est. Budget: $20.00 Posted
    I have a residential construction project that I need to modify my previous MPP schedule to be adapted for and made to complete in 8 months. .MPP and building drawings will be supplied. Editor must have good knowledge of construction tasks and timing to be able to realistically determine what time to allocate to each. Evidence of previous works done will be needed to ascertain qualification.
  • Fixed-Price – Est. Budget: $365.00 Posted
    Experienced estimator or engineer, proficient in using PlanSwift or similar take off software. Must be able to break down into detailed areas eg bathrooms, laundry, balconies etc. and prepare summary as indicated below All tiling areas must be captured including floors and walls, skirtings, splashbacks, balconies etc Produce consolidated and accurate summary identifying quantities for: * Floors * Walls * Splashbacks * Balconies * Courtyards * Lift Lobbies/Passages * Screeding * Waterproofing * Acoustics * All other quantities required where ever tiling and/or waterproofing is required Dedicated, experienced ...
loading