Building Estimation Jobs

57 were found based on your criteria

  • Fixed-Price – Est. Budget: $75.00 Posted
    For this assessment, you will answer some basic questions to verify understanding of a series of cost estimate and then perform a value engineering exercise in relation to an existing cost estimate. The resources can be viewed on this link: https://drive.google.com/folderview?id=0B3ah1sav4biecWozb0k3MmZ5c28&usp=sharing TASK 1. Review each of the estimates provided with the link above. Because they represent different project types in different stages of project completion from multiple sources, they should give you a broad understanding of how estimates are similar or different given these different parameters. 2. Answer the following questions: A. Review the Cost Estimate for the New Residence & Sound Studio. This new residence is new construction taking place within an existing multistory loft space. Assuming the contractor’s total overhead and profit is equal to the General Conditions plus their Profit, what percentage of the total Construction Cost (without the premium for unique construction location) does this overhead and profit represent? For the same estimate, there is a green wall included. Locate it; how many square feet is it? B. Review the Concept Design Estimate for the Public Park. Note the Add Alternates (sometimes referred to as “alternates”) in the latter half of the estimate. These ...
  • Hourly – 3 to 6 months – 10-30 hrs/week – Posted
    Diverse Painting As an Estimator, you are responsible for estimating bid opportunities introduced to the organization electronically and/or from requests made by other sources. You are responsible for creating estimates for commercial work and ensuring that pricing is accurate, competitive, and within company guidelines. Other responsibilities include creating detailed documents for quote preparation and leveraging cost opportunities, providing assistance in the creation of submittals, SOVs and contract processing. Job Description Role and Responsibilities Responsible for working closely with the ...
  • Hourly – Less than 1 week – 10-30 hrs/week – Posted
    Utilizing our developed House Plans in PDF format we want a Material Takeoff list developed in Plan Swift Software. Included in the list will be all lumber, fasteners and materials used to build our Ranch House. The deliverable for this project will be the complete detailed list with all materials and quantities to complete the Ranch House.
  • Hourly – More than 6 months – Less than 10 hrs/week – Posted
    We are looking for freelance estimators who can use buildsoft to perform full estimates based on a provided plan and spec document. We will provide a login to our cloud based buildsoft app, and have pre-loaded plans ready for take off Each job should take around the 1 - 2 hours, and we need overnight turnaround (based in Australia). Jobs are form earthworks through to completion. Need to be able to interpret working drawings, and detailed specifications around residential building.
  • Fixed-Price – Est. Budget: $100.00 Posted
    My work requires me to write a report addressed to my client, the owner, on the Gas Retort House, Berkley Street, Birmingham, focusing on and justifying the potential for its reuse Please review attachment below for further information regarding writing this report. Report Details: The work is in the form of a report to your client (the Owner), set out and justify a proposal for the reuse of the Gas Retort House, Berkley Street, Birmingham. Your report should include: 1 ...
  • Hourly – 1 to 3 months – 10-30 hrs/week – Posted
    Perform take off structural steel drawings. Provide from the take off the total tonnage of structural steel, the lineal meters of purlins and the total number of structural steel members. Template for excel estimating sheet will be provided and guidance in the format that the information should be presented. Work to commence immediately. Must be finished within 3 - 4 days.
  • Hourly – Less than 1 week – Less than 10 hrs/week – Posted
    We have a Space Plan for an Office Tenant that we need to quantity and provide "Preliminary Pricing" on. I would love to find someone to do the whole thing for me , but at a minimum someone familiar with PlanSwift who can provide breakdown of Flooring, Walls, Paint, Lights, and the normal trades expected. We will have photos of expected finished Monday to help with pricing. I will add it to the file soon so the first step is quantifying ...
  • Hourly – Less than 1 week – Less than 10 hrs/week – Posted
    I would like to some one to do research to give me options on building a property in phillipines - iloilo We already have the plot of land. We just need to build a house now so we want to get options of builders who can manage the whole process from start to finish - from design, to build, to delivery. I am looking for a spread sheet with name of builder: year of experience: experience in iloilo links to houses that ...
loading