Construction Jobs

3 were found based on your criteria

  • Fixed-Price – Est. Budget: $120.00 Posted
    In order to provide solutions one must first understand the nature of the building under consideration. Coursework output: • Consider, analyse and discuss case study examples for both the historical expectations and current acoustic performance of unmodernised 1950’s office buildings in the UK. Annotated sketches are acceptable. • Consider, analyse and discuss case study examples for both the historical expectations and current performance of cladding materials in unmodernised 1950’s office buildings in the UK. Annotated sketches are acceptable. • Consider, analyse ...
  • Fixed-Price – Est. Budget: $150.00 Posted
    We currently have a set of standard architectural drawings (plans, elevations and sections) that require converting into accurate construction drawings with precise measurements and details. This is a fantastic opportunity for you to start a long-term arrangement with us for similar projects in the future. The scope of the work includes: - Correcting all measurements in the drawings - Removing unnecessary elements in the drawings - Adding in all relevant precise measurements to the plans - Adding new elements to the drawings (e.g ...
  • Fixed-Price – Est. Budget: $75.00 Posted
    For this assessment, you will answer some basic questions to verify understanding of a series of cost estimate and then perform a value engineering exercise in relation to an existing cost estimate. The resources can be viewed on this link: https://drive.google.com/folderview?id=0B3ah1sav4biecWozb0k3MmZ5c28&usp=sharing TASK 1. Review each of the estimates provided with the link above. Because they represent different project types in different stages of project completion from multiple sources, they should give you a broad understanding of how estimates are similar or different given these different parameters. 2. Answer the following questions: A. Review the Cost Estimate for the New Residence & Sound Studio. This new residence is new construction taking place within an existing multistory loft space. Assuming the contractor’s total overhead and profit is equal to the General Conditions plus their Profit, what percentage of the total Construction Cost (without the premium for unique construction location) does this overhead and profit represent? For the same estimate, there is a green wall included. Locate it; how many square feet is it? B. Review the Concept Design Estimate for the Public Park. Note the Add Alternates (sometimes referred to as “alternates”) in the latter half of the estimate. These ...
loading