- Hourly: $55.00 - $85.00
- Expert
- Est. time: 1 to 3 months, Not sure
This project is for select repairs on a Container Crane that is over 23 years old. Please see the following attachments: 1. Scope of Architect-Engineering Services (SAES) required for this project. 2. Related original crane drawings. 3. Required drawing template. Scope of Work: 1. Boom Hinge Pin Flexible Conduit Replacement as shown in attached drawing. A. Limit flexible conduit to allowable length, install two new junction boxes, and add rigid conduit for Navy compliance. 2. Limit Switch Cable Replacement - Replace the damaged wire. 3. Remove and replace existing Engine Room Exhaust Fans as shown in attached drawing. 4. Repair and replacement of numerous small components for limit switches and stops as shown in attached drawing. General Requirements: 1. Provide the project title, location, and date submitted on the cover sheet of all documents submitted. The Basis of Design, drawings, specifications, engineering calculations must be bound separately. 2. All hardcopy working drawings submitted for review must be half-size (11 x 17 inches (297mm x 431mm)) prints. In addition to a project site-specific map, include a vicinity reference map for all drawing packages and reports/studies. 3. The final drawing set must be full-size (22 x 34 inches (558.6mm x 863.6 mm)) and submitted in electronic format (Adobe PDF and AutoCAD DWG). The Pre-Final Design Package: 1. Design Drawings with Translations 2. Design Specifications, including document edits/revisions 3. Basis of Design 4. Annotated Design Development Design Review Comments 5. Engineering Calculations/Analysis Final Design Package: 1. Design Drawings Certification 2. Design Specifications 3. Basis of Design 4. Annotated Pre-Final Design 5. Engineering Calculations/Analysis DESIGN MILESTONES Pre-Final (100%) 6. Drawings will need a professional engineering stamp Design Submittal: 24 May 2024 Pre-Final (100%) Review by Craneworks: 31 May 2024 Final Design Submittal: 7 June 2024