Steel Reinforcement detailing for RC structure

Closed - This job posting has been filled and work has been completed.

Job Description

I have this building where I need some RC layouts prepared. There is a full ground floor slab, basement transfer slab and full set of stairs from basement to 4th floor.
I have detailed the slabs but want to find someone detail up the stairs and then do the reinforcement scheduling . I enclose a PDF file which shows the structural scheme for the building including all floor plans and sections through foundations and the initial GF RC plan with scheduling for one small section of this work. The bits that have to be detailed and scheduled are in red boxes.
Any takers?

Open Attachment